Construction Solutions for Municipal,
Commercial, Industrial
and Private industries.

Tel: 604 796-3851
Fax: 604 796-0554

TIMBRO builds roads from scratch, initially surveying, land clearing, rock blasting and removal. Next comes filling, leveling and creating any necessary cuts or ditching. Then the complete road structure base is prepared prior to paving.

 

Portside Road Extension

Ports Vancouver, (formerly Fraser River Port Authority, Richmond. 710 metres of road construction.

Chehalis First Nations, Agassiz:

1300 metres of road construction including 11.2 ha clearing and grubbing 1300 m of watermain installation, 13 hydrants and 64 water services

Harrison Highlands

Five kilometres of road construction included; Clearing and Grubbing, Over 150,000 m3 of rock blasting, 40,000 m3 of aggregate placing, sidewalk construction, for a 90 acre residential development. 45,000m3 Rock crushing and screening of the blasted material, Underground utilities installation.

Hope Access Road Construction

Construction of 230m of road includes Clearing and Grubbing, 12,000 m3 of road excavation and placing of road structure.

East Dyke Upgrades, City of Chilliwack

Upgrading of the section of the existing dyke along the Fraser River

You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialize correctly.

Al Hallowes Left Turn channelization MOTH

Cut approx 13,000m3 of slope back. and construct 610m of road on Hwy 1  200m before the town of Yale BC.

This job was performed for the Ministry of Transportation and Highways

You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialize correctly.