Construction Solutions for Municipal,
Commercial, Industrial
and Private industries.

Tel: 604 796-3851
Fax: 604 796-0554

This includes all site preparation prior to construction of the above ground structure.
This means excavation and backfilling, all underground utilities (water, sanitary mains, street lights) and preparation work for paving and laying of concrete.

“Our first project with TIMBRO was in 2004, a water line for the new Chilliwack City Works Building over the XXX creek. They were a very results orientated group and were very helpful in solving issues in getting the line across the bridge. Another project was Harrington Place Seniors Residence in Mission, a complete package including site servicing. This project had a complex access issue where a 150 tonne crane had to be brought in to swing in a steel structural walkway between two buildings. They also did a difficult excavation in space restrictions on the site.” Gerold Grahn, Project Manager, Preview Builders

commercial site

Harrison Square Construction

Construction of the Harrison Square included site preparation, 200m of road construction, sidewalk construction, lock block wall installation

You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialize correctly.

Vernon Carrington States

Construction for a elders complex in Vernon, BC. Timbro offered an entire service package which included works off-site and on-site. This project covered:clearing & Grubbing, excavation, concrete slab prep, on-site sidewalks, Parking lot construction, Stormtech system installation, Complete Water and Sanitary off-site and on-site package.

Quantum Properties- Abbotsford, BC

Servicing of a Residential building in Abbotsford, BC. Work comprised installation of 110mm of 300mm and 200mm DI watermain, Storm works (Oil interceptors, 1350 Manholes, Catch basins), Parking lot and back lane construction.

Shell Site Servicing, Chilliwack

Site servicing for a Shell Gas Station in Chilliwack. The work done included over 7800m3 of excavation amd B/fill, and underground utilities installation.  Timbro followed all the required safety quidelines stipulated by Shell and Petrocom.